Solar Power UWA

Panels

Major components of the system

  • Photovoltaic panels                      2.4 kW
  • Inverter                                      2.5 kW
  • Mounting frames
  • Data logger 
  • Wiring

Conditions for obtaining the AGO rebate

  • must be new or a new extension to an existing system
  • must be installed on principle place of residence
  • only one rebate per residence
  • no other funding from the AGO
  • PV designer, installer (SEIA) accredited, or competent
  • meet relevant electrical and safety standards, regulations
  • must have Western Power (in WA) approval if grid connected
  • Supplier to provide 12 month warranty on system and installation
  • minimum 2 year maintenance contract should be offered
  • must operate on building for a minimum of five years
  • must be available for inspection by State regulator and AGO